Due to the need for reconstruction of the existing building of the Archaeological Museum of Istria and the surrounding landscape, Interkonzalting d.o.o. entered into a contract for on-site supervision and occupational safety coordinator II.
The construction is planned in two phases: PHASE 1 represents the reconstruction and adaptation of the building in existing scales PHASE 2 represents the upgrading of an existing historical building and the final decoration of the surrounding landscape.